Federal government decides reserve power plant regulation, from 2017 then take care wind and solar power plants around the grid stability - if they are allowed
At the current market prices fall because so much power is being produced. The Federal Government has introduced a scheme nevertheless, the conventional power plants continue to guarantee the existence, the reserve power plant regulation. It provides for an annual review of available generating capacity by the Transmission System Operator and the Agency. Power plants should then be required to standby and be decided on the construction on this basis. The policy explains that certain power plants systemically
power plants equipment
different technologies for running power plants
Saturday, June 15, 2013
Monday, July 30, 2012
New fossil fuel power plants protested
CLIMATE CAMPS OF NEW POWER PLANTS
With a lot of energy to coal
In "Climate Camp" to environmentalists nationwide protest against mining and fossil power plants. They also terminate this civil disobedience an.
Devastated landscape: the Hambach mine in North Rhine-Westphalia. Image: DAPD
BERLIN taz | It goes to them about the global climate, global justice - and not least to their habitat. In the three major German lignite districts organized in August, so-called climate camp environmentalists. They protest against the mining and the construction of new coal-fired power plants. Brown coal is for them for a "backward-looking energy policy and inhumane."
In the Rhineland and the Lausitz, where it already existed in 2011 Climate Camp, the organizers expect about 300 participants each. In the anti-lignite camp near Leipzig in Hohenmölsen be expected only 20 to 30. You should probably still build a critical awareness, Annika Rothe says the alliance, "the future instead of brown coal."
Display
With a lot of energy to coal
In "Climate Camp" to environmentalists nationwide protest against mining and fossil power plants. They also terminate this civil disobedience an.
Devastated landscape: the Hambach mine in North Rhine-Westphalia. Image: DAPD
BERLIN taz | It goes to them about the global climate, global justice - and not least to their habitat. In the three major German lignite districts organized in August, so-called climate camp environmentalists. They protest against the mining and the construction of new coal-fired power plants. Brown coal is for them for a "backward-looking energy policy and inhumane."
In the Rhineland and the Lausitz, where it already existed in 2011 Climate Camp, the organizers expect about 300 participants each. In the anti-lignite camp near Leipzig in Hohenmölsen be expected only 20 to 30. You should probably still build a critical awareness, Annika Rothe says the alliance, "the future instead of brown coal."
Display
Monday, November 21, 2011
ewb participates in Grimsel hydroelectric project
The city of Berne utility participates in a hydroelectric power plant
project of the Oberhasli AG (KWO).
When the project is about as part of the investment program to
upgrade KWO plus two existing power plants in the Grimsel area.
These plants - the plants and Innertkirchen Handeck 2 1 - are more
than 60 years old and should be adapted to today's needs, such as the
Berne City Council announced on Thursday.
Now it is all about the construction of a second, larger turbine
water path, a new catch basin, installation of two additional turbines
and the refurbishment of the existing machine. Through these measures,
the performance of the two power plants by more than 60 percent
increase.
The city-owned utility Energie Wasser Bern (EWB) is already involved
with an investment of one sixth of KWO. The investment cost of the
project is now ewb afford any amount. It carries with ewb the annual
operating costs.
With the inauguration of the renewed power plants Handeck
Innertkirchen 2 and 1, the annual costs increase by 11.1 million
francs. For ewb thus additional costs to fall from 1.85 million
francs. However, these are offset by corresponding additional income,
as it is further stated in the notice.
project of the Oberhasli AG (KWO).
When the project is about as part of the investment program to
upgrade KWO plus two existing power plants in the Grimsel area.
These plants - the plants and Innertkirchen Handeck 2 1 - are more
than 60 years old and should be adapted to today's needs, such as the
Berne City Council announced on Thursday.
Now it is all about the construction of a second, larger turbine
water path, a new catch basin, installation of two additional turbines
and the refurbishment of the existing machine. Through these measures,
the performance of the two power plants by more than 60 percent
increase.
The city-owned utility Energie Wasser Bern (EWB) is already involved
with an investment of one sixth of KWO. The investment cost of the
project is now ewb afford any amount. It carries with ewb the annual
operating costs.
With the inauguration of the renewed power plants Handeck
Innertkirchen 2 and 1, the annual costs increase by 11.1 million
francs. For ewb thus additional costs to fall from 1.85 million
francs. However, these are offset by corresponding additional income,
as it is further stated in the notice.
Friday, September 2, 2011
No cost to the city works
No cost to the city works
BY MARTIN VAN DER Putter - last updated: 30.08.2011
Duisburg (RP). The new Block 10 at the Walsum power plant will come on stream until much later than originally planned. The shareholder Stadtwerke Duisburg arise because no additional cost.
Google ads
Cadolto Hybrid OR
Operating room of the future economically and rationally
The new Block 10 at the Walsum power plant will come on stream until much later than originally planned. Photo: Ralf Hohl, RP
The new Block 10 is to make the Walsum coal power plant to the most modern in Germany. However, as reported on Monday, delaying the start-up. Originally, block 10 goes with a capacity of 750 megawatts to the grid as early as 2010, then the first half of 2011 was named as a target.
Now everything looks like it, it will take much longer. How long that no one wants to predict. Of up to two years is the question. "The start will be delayed significantly," Alexandra Boy put it, a spokeswoman for Evonik.
Hundreds of leaks
Blame for the recent delay was an ultra-modern steel, the Japanese manufacturer Hitachi. The steel with the designation T 24 was compatible with apparently not a detergent. A chemical reaction then led to hundreds
BY MARTIN VAN DER Putter - last updated: 30.08.2011
Duisburg (RP). The new Block 10 at the Walsum power plant will come on stream until much later than originally planned. The shareholder Stadtwerke Duisburg arise because no additional cost.
Google ads
Cadolto Hybrid OR
Operating room of the future economically and rationally
The new Block 10 at the Walsum power plant will come on stream until much later than originally planned. Photo: Ralf Hohl, RP
The new Block 10 is to make the Walsum coal power plant to the most modern in Germany. However, as reported on Monday, delaying the start-up. Originally, block 10 goes with a capacity of 750 megawatts to the grid as early as 2010, then the first half of 2011 was named as a target.
Now everything looks like it, it will take much longer. How long that no one wants to predict. Of up to two years is the question. "The start will be delayed significantly," Alexandra Boy put it, a spokeswoman for Evonik.
Hundreds of leaks
Blame for the recent delay was an ultra-modern steel, the Japanese manufacturer Hitachi. The steel with the designation T 24 was compatible with apparently not a detergent. A chemical reaction then led to hundreds
CLEAN ENERGY Biogas share increased to more climate protection
CLEAN ENERGY Biogas share increased to more climate protection
Energy & Environment
Press release from: SE CLEAN ENERGY GmbH & Co. KG
Load data from Twitter
Load data from Facebook
Cologne, 01.09.2011 - The clean energy is now even more environmentally friendly: 09/10/2011 To bring the national Ökogasspezialist a new product with increased biogas share of 10 percent on the market. In this way the clean energy not only an active contribution to climate protection but also allows homeowners to central targets of the Renewable Energies Heat Act (EEWärmeG) requirements. CLEAN GAS bio10 is offered given that the equipment is available in addition to the existing tariff of 5 percent bio-gas.
"Good news for all friends of the environment, because the higher proportion of the biogas, will improve the carbon footprint compared to conventional natural gas," says Managing Director Stefan HE Dott. "With the increased biogas share, we want to promote the development of renewable energies - and to remain competitive prices, as a result of our modern procurement strategy, we can keep the price premium for the biogas-plus within narrow limits." In Baden-Wuerttemberg benefit homeowners by a further advantage : The EEWärmeG writes on there since January 2010 that after the restoration of a heating system at least ten percent of the annual heat demand must come from renewable energy sources. A target that can be met by the new CLEAN GAS bio10 without further investments or retrofits.
Price studies repeatedly show that biogas is not more expensive than conventional gas must be. On the contrary: "Our customers can be compared to primary care savings of up to several hundred euros a year," said Stefan Dott. "Ecology and economy are not a contradiction." The CLEAN ENERGY has been awarded several times by comparison portals and trade magazines for their cheap rates.
CLEAN ENERGY Biogas is from biogenic waste materials, such as plant remains of Agriculture won, and upgraded to natural gas quality. This portion of the biogas is carbon neutral, because when it is burned as much CO2 is released as the herbal raw materials have included in their growth.
Click here to find out more about mining equipment that is offered for sale.!
The SE CLEAN ENERGY GmbH & Co. KG is a sales company in Cologne, which was founded by six regional suppliers from North Rhine-Westphalia and Hesse to sustainable energy products nationwide to offer. The focus is now on natural gas with a growing share of biogas, which is marketed under the brand name CLEAN GAS. With over 20,000 customers nationwide clean energy is now number two among the German Ökogasanbietern.
This press release was published on openPR.
SE CLEAN ENERGY GmbH & Co. KG, Bayenthalgürtel 9, 50968 Cologne, www sauberenergie de, please contact: Achim Heinze, Phone 0221-93731-363, 0221-93731-366 Fax,
The CLEAN ENERGY stands for a consistent link between ecology and economy. As a service-oriented utilities we offer through our online distribution platform as well as for www saubergas de about our exclusive marketing partner under the brand name CLEAN GAS affordable biogas products retail. In addition receive Geschäfts-/Großkunden environmentally friendly and economically attractive gas products, tailored to individual requirements. Since it is CLEAN GAS is a pure online product, our organization and all processes are streamlined. The resulting price advantage we pass on to our customers. In the coming years we expect to increase the share of biogas in our products further. In the long term natural gas will be completely replaced by carbon-neutral biogas.
Energy & Environment
Press release from: SE CLEAN ENERGY GmbH & Co. KG
Load data from Twitter
Load data from Facebook
Cologne, 01.09.2011 - The clean energy is now even more environmentally friendly: 09/10/2011 To bring the national Ökogasspezialist a new product with increased biogas share of 10 percent on the market. In this way the clean energy not only an active contribution to climate protection but also allows homeowners to central targets of the Renewable Energies Heat Act (EEWärmeG) requirements. CLEAN GAS bio10 is offered given that the equipment is available in addition to the existing tariff of 5 percent bio-gas.
"Good news for all friends of the environment, because the higher proportion of the biogas, will improve the carbon footprint compared to conventional natural gas," says Managing Director Stefan HE Dott. "With the increased biogas share, we want to promote the development of renewable energies - and to remain competitive prices, as a result of our modern procurement strategy, we can keep the price premium for the biogas-plus within narrow limits." In Baden-Wuerttemberg benefit homeowners by a further advantage : The EEWärmeG writes on there since January 2010 that after the restoration of a heating system at least ten percent of the annual heat demand must come from renewable energy sources. A target that can be met by the new CLEAN GAS bio10 without further investments or retrofits.
Price studies repeatedly show that biogas is not more expensive than conventional gas must be. On the contrary: "Our customers can be compared to primary care savings of up to several hundred euros a year," said Stefan Dott. "Ecology and economy are not a contradiction." The CLEAN ENERGY has been awarded several times by comparison portals and trade magazines for their cheap rates.
CLEAN ENERGY Biogas is from biogenic waste materials, such as plant remains of Agriculture won, and upgraded to natural gas quality. This portion of the biogas is carbon neutral, because when it is burned as much CO2 is released as the herbal raw materials have included in their growth.
Click here to find out more about mining equipment that is offered for sale.!
The SE CLEAN ENERGY GmbH & Co. KG is a sales company in Cologne, which was founded by six regional suppliers from North Rhine-Westphalia and Hesse to sustainable energy products nationwide to offer. The focus is now on natural gas with a growing share of biogas, which is marketed under the brand name CLEAN GAS. With over 20,000 customers nationwide clean energy is now number two among the German Ökogasanbietern.
This press release was published on openPR.
SE CLEAN ENERGY GmbH & Co. KG, Bayenthalgürtel 9, 50968 Cologne, www sauberenergie de, please contact: Achim Heinze, Phone 0221-93731-363, 0221-93731-366 Fax,
The CLEAN ENERGY stands for a consistent link between ecology and economy. As a service-oriented utilities we offer through our online distribution platform as well as for www saubergas de about our exclusive marketing partner under the brand name CLEAN GAS affordable biogas products retail. In addition receive Geschäfts-/Großkunden environmentally friendly and economically attractive gas products, tailored to individual requirements. Since it is CLEAN GAS is a pure online product, our organization and all processes are streamlined. The resulting price advantage we pass on to our customers. In the coming years we expect to increase the share of biogas in our products further. In the long term natural gas will be completely replaced by carbon-neutral biogas.
Wednesday, December 15, 2010
nuclear reactors and heavy equipment
Potsdamer investigators unravel the network of Russian-smuggling deals for nuclear reactors in Iran
FRANK SCHAUKA
POTSDAM Potsdam prosecutor's investigations of the smuggling of special parts for the construction of a nuclear power plant in the Iranian coastal city of Bushehr have expanded considerably. At the beginning of the investigations in 2004 to only focused on the "Atom-brothers" as a tabloid newspaper called George and K. Axel. The two heads of the special heavy equipment engineering ISV from near Magdeburg have long been condemned.
But now, almost three years after the first raid, the extent of the investigation to look little more complex, in connection with the secret, is anti-Israeli nuclear weapons program of Iran. This year, the group of suspected suppliers has once again expanded considerably. "There are now nearly 50 companies, and it does not stop," said the Potsdam prosecutor Chris Lange, determined the nationwide in the fall. Against a dozen companies is already determined.
Potsdam's authority as a priority prosecution for economic crimes in Brandenburg is responsible, because "nuclear-brothers" had tried in 2001 and 2002, one cut in ten parts of crane that was moving in the power plant Bushehr fuel rods, the Brandenburg-Polish border into Russia and finally To export to Iran. Customs investigators came to the business in 2004, when they routinely sighted export delivery notes of the ISV. From Germany, in principle, should any items be exported to Iran, where they can be used as nuclear technology. Because such export is always to the detriment of the Federal Republic of diplomatic entanglements allies.
What is the value in the coastal city of Bushehr had illegally supplied parts, also can only guess. "So far we have seen a total contract value of slightly more than five million dollars," says the specialist economic crime, Lange, "but there must be more run." Much more. Probably more than $ 100 million. There is even an indication for a contract worth about $ 150 million.
The fact that the mastermind behind the smuggling deals will soon be prosecuted, is not yet in sight. The main accused, all of German business people of Russian origin have settled in time to Russia. Presumably, they enjoy it for the protection of government regulators. After all, had Dmitri S., CEO of Vero and export trading company, and his accomplices of Berlin from the smuggling operations on behalf of the government-Russian company Atomstroyexport (ASE) is threaded. For the investigators is clear after intensive investigations: Between ASE and the now liquidated company Vero trade, there is no dividing line. "Vero is ASE, for example, the managers have the same fax numbers on their business cards," said Lange.
The war destroyed the nuclear reactor-Siemens
How important is the construction of the Bushehr miles for Russia has seen in the fact that the great power any sanction against Iran to prevent the international community, especially the United States, to impose for the alleged nuclear bomb program wants. The ASE is building in the Russian government commissioned world's nuclear power plants - even in Bushehr on the Persian Gulf. The contracted volume of orders for this Meilerbau is 800 million U.S. dollars. For Russia, there is a lot.
As high as the profit, so large are obvious to the Russian contractor, the problems with the construction of light water reactor. Without them, the smuggling is not explained. In 1974 during the reign of Reza Shah Pahlavi Western-oriented, the German Siemens Group to build the reactor in Bushehr. The Iranian Revolution was the 1979 Imperial Peacock Throne to collapse, and during the first Gulf War from 1980 to 1988 destroyed the Iraqi military reactors in the Persian Gulf. Iran asked why in 1990 at Siemens, whether the group the power plant from the ruins build again. But the Federal Office of Economics and Export Control in Eschborn near Frankfurt am Main, Siemens issued no permit. Subsequently, Iran concluded in 1995 with the Russian Atomic Energy Ministry signed a contract on reconstruction and commissioning of Bushehr. After this 800-million-dollar deal should the power plant to go online in 2001. But the technical - and smuggling technical - problems could not be solved so quickly.
During the Cold War espionage-from strategic considerations, nuclear reactor before and behind the iron curtain built fundamentally different DIN standards. Even if the secret construction plans popular items would be spied on, so a replica was pointless. The systems were just not compatible in detail.
Russia's problem and the solution smuggling
Prior to this difficulty, the Russians were in 1995: They had not to complete the theory nor the material to the reactor designed to Western standards. To overcome the obstacle, the mid-1990s, the quasi-governmental group founded Atomstroyexport. He should build the world order in Russian nuclear power plants. However, ASE, this was another problem, the contacts with potential suppliers were missing in the West. Therefore, set up by the ASE in Western Europe so-called front companies or if it was appropriate, contacted - such as Vero Dimitrij S. GmbH of Berlin. From 1999/2000, the trading company which had exported since the early 1990s, all sorts of goods-and fixed only to the Bushehr business.
How the Vero / ASE-people, a special company that has designed a central core for the reactor in Bushehr: the crane that was used inside the power dome millimeter fuel into the combustion chambers.
That the Vero-dealer, the "atom-brothers" found near Magdeburg, is probably not a coincidence. Within the Warsaw Pact, the GDR was a cross-border responsible for the production of heavy equipment for the nuclear power plant construction. George K. was an absolute expert in this field. The businessmen from Vero knew off and had probably also have lists of experts from the past. The "Atom-brothers" K. ordered in turn required parts for other companies.
And not all of these companies were clueless. After all product components have been sought for a nuclear power plant on the technical levels of the 1970s. Much of this was out of date, some long since removed from the production program. Some companies that have been requested by the Magdeburger ISV engineering firm, declined not only in thanks, but refers also to the legal situation: banned exports to Iran. The fact that some German companies to give up yet for the nuclear smuggling, is explained clearly and with the pressure, the Vero / ASE build wont. Under the motto "carrot and stick" the company is made clear: By participating, is the way to the Eastern European market paved - who resists, no chance there.
The "Atom-brothers" knew that they were acting illegally. They claimed initially, the crane was destined for Russia, which would have been permitted, but stood under the weight of the evidence it quickly. Extremely helpful for the truth, according to the experience of German investigators always a reference to the black list of the U.S. administration. For companies on this list, the U.S. market is taboo. And end up on this list all companies, of which it becomes known that they supply parts to Iran nuclear plant or company curl_exec do this.
In a public trial before court that the prosecutor suspects makes it clear the path to the list can not be avoided. Presumably this is a major reason why smuggling methods are often completed in the necessary silence. Long known as federal prosecutors in these cases, in which enters a company's negotiators to his office and begins the conversation by saying: "I am instructed to inform you on behalf of the company to offer full cooperation."
Saar-mining technology to score in Ukraine and Russia
(2009-11-17 17:18:21)
Eastern Europeans looking for partners here
Related links:
:: After mining rise in the Saarland, the level (22.07.)
:: Well not a mine under rice Bach?
:: Mining: Left seem willing to compromise
:: Mid-2012 finally stop mining in Saarland
:: Mining Saar: human resources planning is
:: Coal production goes to 2012
:: Mining-affected politicians show the red card (31.07.)
:: Mining opponents warn of red-red government (30.07.)
Saarbrücken. The mining company RAG RAG German hard coal Mining Solutions launched a new company to life. This has the objective of the mining equipment and mining technologies, which in Germany are no longer needed to market internationally. A first attempt was the director of the mine Saar, Friedrich Breinig, visiting Ukrainian-Russian delegation at the mine. "We can both offer high-quality equipment and help them to adapt to local geological conditions," said Breinig.
The mining experts from Eastern European countries are "very interested in German technology," said Boris Bokij, chief financial officer of the mine Sasjadko (Ukraine). It must however be guaranteed a service on site. Vladislav Norkin of the Russian group wants ADD gas being flared in oil refineries to use as energy. But he is looking for partners in the Saarland. The delegation has now stand at the Saarland. Organized the visit of "Saarland international", a collaboration between the Ministry with the Centre for Productivity and Technology (ZPT) has been.